Rajasthan Region
Rajasthan Basin Blocks
Rajasthan Onshore Block (RJ20)
RJ-ONN-2004/2
| March 2, 2007 |
Signed Production Sharing Contract (NELP VI) |
| January 21, 2008 |
Production Exploration License issued |
| Area |
Approximately 2,196 sq. km. (542,643 acres) |
| GGR PI |
25% |
| Partners |
Oil India Limited = 75% (operator) |
Block Commitments
Total wells to be drilled in all Phases is 13 (12+1)
| (i) |
Reprocess 463 line km. of 2D seismic |
| (ii) |
Gravity magnetic survey of 2,500 stations |
| (iii) |
Acquire, process and interpret 250 line km. of 2D seismic and 700 sq. km. of 3D seismic |
| (iv) |
Geochemical survey of 500 samples |
| (v) |
Drill 12 exploration wells to various depths between 2,000 and 2,500 meters |
| (vi) |
Drill 1 exploration well to 2,500 meters |
| (i) |
Phase I – 25% |
| (ii) |
Phase II – 100% except for development and discovery areas |
Top
Rajasthan Onshore Block (RJ21)
RJ-ONN-2004/3
| March 2, 2007 |
Signed Production Sharing Contract (NELP VI) |
| January 21, 2008 |
Production Exploration License issued |
| Area |
Approximately 1,330 sq. km. (328,650 acres) |
| GGR PI |
25% |
| Partners |
Oil India Limited = 60% (operator) Hindustan Petroleum Corporation Limited = 15% |
| As at August 13, 2010, a total of 1 well has been drilled on this block |
Block Commitments
Total wells to be drilled in all Phases is 9 (8+1)
| (i) |
Reprocess 463 line km. of 2D seismic |
| (ii) |
Gravity magnetic survey of 2,500 stations |
| (iii) |
Acquire, process and interpret 310 line km. of 2D seismic and 611 sq. km. of 3D seismic |
| (iv) |
Geochemical survey of 500 samples |
| (v) |
Drill 8 exploration wells to various depths between 2,010 and 2,510 meters |
| (vi) |
Drill 1 exploration well to 2,000 meters |
| (i) |
Phase I – not less than 25% |
| (ii) |
Phase II – 100% except for development and discovery areas |
Top